Construction of Vilnius Railway Bypass completed

Kyviškės-Valčiūnai Bypass Project worth over EUR 50 million was implemented by Lithuania Railways (AB Lietuvos Geležinkeliai). It will allow to direct freight cargoes from the city. The European Union funded 85 percent of the project while Lithuanian Railways funded 15 percent.

According to Prime Minister Algirdas Butkevičius, it is important not only that freight cargoes will bypass residential areas but that freight volume will increase.

“The bypass is yet another significant step in modernising the 9th international railway corridor dragging from the state border with Belarus to Klaipėda. Investment in the modernisation of the corridor will allow Lithuania to boost its position as a transit country in the future as well as gain a competitive advantage. Conditions will be created to carry more cargoes to the port of Klaiėeda, while Lithuania’s budget will earn more revenue,” said the prime minister.

Minister of Transport and Communications Rimantas Sinkevičius had no doubt about the benefit of the project either. According to him, transit flow via Lithuania will increase and stimulate economic growth. Freight trains will be diverted from Vilnius city which will reduce congestion and the risk of pollution.

Related Post

During the implementation of Kyviškės-Valčiūnai Bypass Project a 24.5 km stretch of railway line built after the Second World War for transporting special cargoes was reconstructed. A second rail line was laid in addition to the previous single one with the goal to increase cargo throughput. Stations, roads, switches, traffic management and electricity supply systems and telecommunications were reconstructed. 24 bridges and culverts as well as 10 crossings were reconstructed too.

The latest railway technologies applied globally were used while implementing the project, they ensure long-lasting, reliable and durable infrastructure that meets environmental requirements.

In addition to the aforementioned changes, two underground pedestrian crossings, a viaduct and a single-level pedestrian crossing were erected. More than 5 km of sound absorbing walls were built and 200 windows in residential buildings were replaced.

Share

Recent Posts

  • Economy

Tarutis: Let’s stop frightening each other. How tensions are affecting housing markets in the world’s truly ‘hot’ spots

Lately, even the housing market reviews have started from the perspective of the threat of…

11 hours ago
  • Culture

Photo Exhibition – In the Light we sometimes see

The photo exhibition “In the Light we sometimes see,” curated by Professor of Visual Arts,…

5 days ago
  • Politics

Ignas Vėgėlė and why his family’s business denies what it previously took pride in

Attorney Ignas Vėgėlė gained fame during the quarantine period as the Chairman of the Bar…

1 week ago
  • Tribune

33rd session of the Assembly of People of Kazakhstan held in Astana

Under the chairmanship of President Kassym-Jomart Tokayev, the session of the Assembly of the People…

3 weeks ago
  • Latest

Predicting the fundamental goals of the presidential candidates: what each one really wants to achieve by participating

Political analysts believe the only candidate running for victory in the presidential elections is the…

3 weeks ago
  • Defence

President Macron’s Ukrainian arithmetic

What is behind President Macron’s refusal to rule out sending Western troops to Ukraine? Is…

1 month ago