
Funding was allocated from the Connecting Europe Facility (CEF) for three projects: the development of Rail Baltica railway in Estonia, Latvia and Lithuania (EUR 442.23 million); Rail Baltica railway construction from the Polish-Lithuanian border to Kaunas and for the preparation to lay European-gauge railway line from Kaunas to the Lithuanian-Latvian border (EUR 105.9 million); and for the reconstruction of Rail Baltica lines in Poland.
A total of EUR 131.26 million will be allocated for the Rail Baltica railway line in the territory of Lithuania.
Be the first to comment